Jeffery J. Lyon
5101 East Toniko Drive Phoenix, AZ. 85044
(425) 387-4310-Cell cptlyonj@yahoo.com Education & Training: NOV
2014 PMP Exam Preparatory
Workshop – EZ Certifications – Anchorage, AK MAR
2012 Technical Writing –
Applied for Alyeska – University of Alaska – Anchorage, AK NOV 2010HAZWOPER 24 Hour – Environmental
Management Incorporated, - Anchorage, AK FEB 2010North Slope
Training Co-Operative – Alaska Interstate Construction, Anchorage, AK MAY 2008 Masters
Certificate in Project Management – Stevens Institute of Technology, Everett,
WA APR 2008 Member of
the Project Management Institute, Alaska Chapter APR
2008 Project Management
Contracting & Negotiating Skills – Stevens Institute of Technology,
Everett, WA DEC 2007 Open Plan Professional, CSPR-Cobra
– The Boeing Company, Everett, WA DEC 2007 Project Management Risk Management
– Stevens Institute of Technology, Everett, WA OCT 2007 Project Management Scope,
Schedule, & Cost – Stevens Institute of Technology, Everett, WA OCT 2007Project Management Simulations –
Stevens Institute of Technology, Everett, WA SEP 2007Human Dimensions for Project
Management – Stevens Institute of Technology, Kirkland, WA JUN
2007 Quality Management Tools
& Process – Thomson Learning Center, Everett, WA MAY 2007 Microsoft Project 2002 & 2003
– Thomson Learning Center, Everett, WA MAY 2007 Project
Management Based on PMBOK Guide 3rd Edition – Thompson Learning Center,
Everett, WA DEC 2006 Tools
& Techniques of Project Management – Stevens Institute of Technology, Everett,
WA OCT 2005 P3e Certificate – Integrated
Project Solutions, Bellevue, WA Technical Skills: 10 Key, Type 60+ words per minuteExcellent
Customer Service skills Attention to detailStrong computer skills
both in hardware and software Computer Skills: Primavera Project
Planner Engineering/Construction (P6 R8.1, P5, P4, P3e, P3e/c), Open Plan
Professional, Steelray, Microsoft Suites: Project 2002, 2003, Access,
PowerPoint, Visio, Word, Excel, Works, Word Perfect, Notebook, Word Pad and
Outlook. Lotus Smart Suites:
Lotus Word Pro, Lotus 1-2-3, Lotus Freelance Graphics, and Lotus Organizer.
Experienced working with Windows 2000, XP, Explorer 8, and the Internet. SAP,
CPR, PCR, Acrobat Reader, Windchill, Milestone Professional, Image Shack,
Wholesale UPS Shipping System Work Experience: Hawk Consultants LLC, Project Team
Scheduler, Anchorage, Alaska – February 12th 2012 – September
30th 2015 Engineering, Pipeline, Right of Way, &
Automations Project Team Scheduler for Alyeska Pipeline Company. Responsible for working closely with the
Engineering Supervisor, Project Technical Lead, Project Manager and the
Integrated Project Team to facilitate the development of scope of work, the
work breakdown structures, identify target milestones, and develop critical
path resource loaded schedules for projects with an emphasis on FEL planning,
conceptual engineering, preliminary engineering and detailed design as well
as overall project implementation support and closeout. Update the project
schedule template with engineering and project deliverables which will be
modified as required for individual projects. Update and maintain the project
status and baselines on a weekly basis Experienced with AMS/TAPS project process.
Assist in development of baseline packages in support of AMS-003. Comprehends
internal and external reporting requirements and structures reports and
communication tools accordingly. Communicate via face to face, telephone and
electronic mail with internal and external contacts. Facilitate routine
progress and planning/scheduling meetings with the integrated project team.
Assist with impact analysis and long range cost forecast adjustments. Ability
to work safely, independently, and perform successfully in a team
environment. Maintains documentation subject to audit, such as baseline
schedules, and as-built schedules to ensure compliance with written
guidelines, policies and procedures. ICRC, Scheduler Senior, Anchorage, Alaska –
December 1st 2011 – February 9th 2012 GCI Pt. Thompson Project Scheduler Senior.
Responsible for detailed development of program and project schedules,
including establishing a work breakdown structure (WBS), determining the work
activity duration, developing logic-driven schedules, and establishing the
proper work flow and logic network relationships using Primavera P6. Work
closely with program management, engineering, procurement, and construction
discipline personnel. Responsible for creating baseline and master schedules
and updating them on a weekly or monthly basis. Provide performance metrics as required by
ICRC clients such as Earned Value, Actual Costs against total project budget
planned values. Perform program and construction schedule analysis to include
but not limited to analysis of changes to the Critical Path due to
construction modification, changes and delay (lag and lead) analysis. Reviews
schedules, designs, and construction activities and offers recommendations
for modifying timeframes based upon knowledge of project and construction
operations. Ensures activities are sequenced as schedules are updated to
reflect approved changes in schedule baselines. Review construction
contractor’s schedule, equipment delivery plans and progress-to-date and uses
data to perform monthly projects of Construction Work in Place (WIP). Works with and understands project budgets,
schedule and activity coding, man-hour performance systems and reports, and
other elements of overall project monitoring. Communicates regularly with
Construction Oversight Engineers and Quality Assurance Technicians to monitor
and track actual construction progress against project target schedules and
potential schedule delays to include cost impacts. Udelhoven Oilfield Services, Project Team
Scheduler, MCC – Prudhoe Bay, Alaska – April 1st 2010 – June 1st 2011 Functional Check Out and IFS Project Team
Scheduler for BP Exploration Alaska, MCC. Develop the project planning and
scheduling controls strategy, plans and procedures, reflecting contractor
roles and responsibilities. Adhere to the segment financial and business and
project processes. Provide the necessary schedules to ensure the development
of proper estimates and studies within a project stage and for sanction. Coordinate and develop appropriate internal
and external schedule benchmarks and technical limits. Prepare and implement
project-wide work breakdown structure (WBS) / cost breakdown structure.
Ensure the preparation and development of appropriate detail and summary
project control schedules. Implement and monitor schedules within each
project stage and for entire project until completion or close-out. Look
ahead to ensure readiness to progress forward works. Ensure the preparation and develop the
interface schedule. Coordinate preparation of schedule risk analysis. Provide
schedule input to and implement schedule element of the change management
(continue) procedure. Provide schedule input to and implement the schedule
element of risk management plan. Coordinate the development of risk
mitigation plans as delegated. Prepare and implement project-wide progress
measurement and reporting system, including rollup levels, section weightings
and reporting cycle calendar. Develop and issue various reports to appropriate
stakeholders. Prepare and present project information to appropriate
stakeholders. Alaska Interstate Construction, Project
Team Scheduler, Tok-Anchorage, Prudhoe Bay, Alaska – October 13th 2009- April 1st 2010 Alaska Highway Tanana River Bridge #505
Team Scheduler - Alaska Interstate Construction. Maintain project schedule
submittal working file, identify the need for recovery schedules. Update
schedule regularly during project planning & execution development.
Review initial schedule with Engineering and Project Construction Manager and
incorporate changes as necessary. Assist the Project Manager with tracking
lost work days due to unforeseen work stoppages and/or weather delays.
Maintain current and baseline schedules. Develop Time Analysis Studies to
determine using data collection and statistical analysis. Udelhoven Oilfield Services, Project
Controls Engineer, Anchorage, Alaska – June 9th 2008 – January 23rd 2009 DS1Q Booster Pump,
& Well Tie-In Project Team Scheduler for Conoco Phillips Alaska, GKA.
Maintaining current and baseline schedules for each Capital project assigned
to it from Project Work Release until Closeout is complete. Timely and accurate
reporting of all mandated reports, in accordance with the appropriate TIER
Level Performance Reporting Critical Path analysis. “Reasonable and Logical”
checks to the activity sequencing and durations. Set up and maintain
resource loaded schedules. Collecting/reporting progress, evaluating
variances, developing work-around plans, and coordinating resolution of
variances. Development and maintain schedule in accordance with the schedule
basis. Ensuring that project schedules are updated on the common server, in
the correct formats and architecture. Completion of the Project Schedule
Quality Control Checklist. The Boeing Company, Project Team Scheduler,
Everett, Washington – February 10th 2006 – May 23rd 2008 Pre-Integration,
Tooling and Field & Delivery Team Scheduler for Boeing’s 787 Program.
Provide earned value through SPI & CPI reports on a weekly basis. Update
status at activity level through red-lines. Maintain status for milestones
and related activities. Support recovery plan on late or for-seen late
activities. Attend weekly meetings to gather updated information and to
provide input on earned value through presentations. Training and
assisting in the practices of: data input and data validation into and out of
the Primavera Tool Suite and Open Plan Professional. Coordinate of baseline
revisions, validation of all data which is to be introduced into the
production database from the Work Statement Tool, transferring data provided
by spreadsheets, Microsoft Access, or provided file into Primavera. Provide customer
service to the Pre-Integration, Tooling and Field & Delivery Team within
the Boeing Commercial Airplanes 787 Program. Serve as a Project Scheduler
representative from PP&C. Participated within
the Program Planning & Control (PP&C) organization to demonstrate
proficiency in all project management areas as described in industry
standards. Schedule and plan own work assignments. Stakeholder analysis,
project plans, and resource-loaded integrated project schedules. Develop work-around
plans, schedule recovery plans, alternative options or scenarios, resource
capacity plans, risk mitigation plans or re-base lining the project as
required. Provide recommendations to decision makers. Work to improve project
management processes and business systems that support project decision
makers. Help to define
project requirements in own area of specialty. Build an integrated plan,
resource loaded schedule. Manage change through baseline management and
provide status with Earned Value (Cost & Schedule variances). |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|